The Case
A couple in Bengaluru, Karnataka needed a rooftop extension for their home just two months before their wedding. Their desire for personal space within their family home heightened the urgency for a swift solution without compromising quality.
The Challenges
The customers had a clear vision but faced challenges hindering execution. The challenges were:
Time Constraint
With only two months to go for their wedding, there was immense pressure to complete the rooftop extension project promptly without sacrificing quality, as the couple wanted a space of their own without having to leave their family house.
Design Adaptation
Another major requirement was to incorporate the rooftop extension seamlessly into the existing 30-year-old structure with minor modifications and maximum utility. This also highlighted the need for lightweight construction that would not harm the original structure.
The Nest-In Solution
To address these challenges, our team of experts devised a comprehensive solution tailored to the couple’s needs.
Fast-Tracked Process
Every aspect of the project, from design to installation, was fast-tracked to meet the tight timeline. From the selection of materials to the interiors, everything was seamlessly done within the construction timeline.
Meeting the two-month timeline was possible with our prefabricated construction processes because the components of the prefab structure are created in a factory-controlled environment with precision and accuracy. They are then transported to the final site for final assembly or installation, and for electrical and plumbing connections. This process is different from building conventional structures, where time is taken to dry and cure cement, lay and set bricks in place, apply and dry spackle, etc.
Efficient Design
Leveraging the existing structure, we made minor modifications to the design to ensure seamless integration of the rooftop extension using prefab construction material. This way, we ensured the existing structure’s safety and added a modern touch to the extension home.
The Result
Despite the short project timeline and challenges, we successfully delivered the Terrace home project for the couple. The project was executed swiftly, meeting the two-month deadline set before the wedding. The couple was very satisfied with our team’s expert services, highlighting the speed, efficiency, and quality of the construction. The rooftop extension seamlessly blended with the existing structure, enhancing the aesthetic appeal and functionality of the home.
This case study showcases our ability to navigate tight timelines and complex design requirements while prioritising quality and customer satisfaction. As a leading provider of prefab construction solutions in India, we at Nest-In continue to demonstrate our commitment to delivering exceptional results, enriching the lives of homeowners, and enhancing the urban landscape with innovative, sustainable, and efficient Prefabricated building solutions.
Posted in Nestudio on Mar 15, 2024.
Contact Us
Recent Post
Build Faster and Safer Prefab Accommodation Facilities
Prefab Structures for Modern Healthcare Needs
How Nest-In Is Paving the Way to Rapid Healthcare Infrastructure Solutions
Nest-In Prefab Solutions: A Game-Changer for Prefabricated Hospitals in Unstable Terrains
Category
- Nest-In 45
- HabiNest 58
- MobiNest 134
- Nestudio 31
- EzyNest 20
- Smart EzyNest 5
- ChargeNest 6
- Covid Offerings 4
- Brand 10
Add comment